During work, you may notice:

  • Marking of utility lines and utility survey holes.
  • Road and sidewalk closures.
  • Traffic control.
  • Parking restrictions.
  • Temporary changes to access.
  • Construction noise.

We install natural gas line by open trenching and boring.

  • Boring uses a specialized machine to create an underground pathway through which the natural gas line is pulled or drilled.
  • Open trenching involves digging a trench and placing the natural gas line in the trench.

Please alert traffic control if you need to access a location within a road, sidewalk or alley closure during construction.

We will restore work areas to conditions required by permits as weather allows. Work areas may be left temporarily restored after construction until we can complete final restoration.